|
Kind of
service |
Syrian |
Non Syrian |
|
Fresh water
supply (per cubic meter)
a-
by floating tanker
b-
from the quay |
50.00
20.00 |
1.00
0.40 |
|
Electricity (
per kilo watt or part thereof ) |
5.00 |
0.10 |
|
Cost of
turning on or off the electricity |
2000.00 |
40.00 |
|
Weighing on
the way bridge ( per operation ) |
25.00 |
0.50 |
|
Weighing on
small platform scales in the warehouse per ton or part thereof (
per operation ) |
25.00 |
0.50 |
|
Delivery of
certificate or issue of document( per certificate or document)
|
50.00 |
1.00 |
|
Repairing
damages parcels ( per parcel and the charge of repairing does
not include the value of materials used for reparation ) |
50.00 |
1.00 |
|
Sealing
parcels ( per parcel ) |
10.00 |
0.20 |
|
Occupancy of
quays ny scales ( per scale/day or fraction ) |
250.00 |
5.00 |
|
Diver ( per hour or part thereof ) |
600.00 |
12.00 |
|
Occupancy per
m2/day or part thereof |
5.00 |
0.10 |
|
Idling and
waiting charges
A- waiting
time for laborers: per labor/hour |
50.00 |
1.00 |
|
B- idling equipments: per equipment/hour |
50% fifty per
cent of the equipment hire |
50% fifty per
cent of the equipment hire |
|
C- idling the
quay: per linear meter of the Vessel length /hour or part thereof |
10.00 |
0.30 |
|
Diving boat
with its equipments ( per hour or part thereof ) |
2500.00 |
50.00 |
|
Passenger
boat hiring ( per hour or part thereof ) |
1500.00 |
30.00 |
|
Tug or boat up
to 500 h.p. ( per hour or party thereof ) |
5000.00 |
100.00 |
|
Tug boat
exceeding 500 h.p. up to 1000 h.p. ( per hour or part thereof ) |
10000.00 |
200.00 |
|
Floating crane
capacity 100 tons( per hour or part thereof ) |
10000.00 |
200.00 |
|
Floating crane
capacity 30 tons ( per hour or part thereof ) |
6000.00 |
120.00 |
|
Lighter ( per
day or part thereof ) |
2000.00 |
40.00 |
|
Land mobile
crane capacity up to 15 tons ( per hour or part thereof ) |
1000.00 |
20.00 |
|
Land mobile
crane capacity between 15 – 50 tons( per hour or part thereof) |
2000.00 |
40.00 |
|
Land mobile
crane capacity between 50 – 75 tons( per hour or part thereof) |
3000.00 |
60.00 |
|
Land mobile
crane capacity more than 75 tons ( per hour or part thereof ) |
5000.00 |
100.00 |
|
Quay electric
crane capacity up to 6 tons ( per hour or part thereof ) |
1000.00 |
20.00 |
|
Quay electric
crane capacity between 6 – 20 tons ( per hour or part thereof ) |
2000.00 |
40.00 |
|
Quay electric
crane capacity more than 20 tons ( per hour or part thereof ) |
20000.00 |
400.00 |
|
Forklift
capacity up to 3 tons ( per hour or part thereof ) |
500.00 |
10.00 |
|
Forklift
capacity between 3 to 10 tons ( per hour or part thereof ) |
1000.00 |
20.00 |
|
Forklift
capacity between 10 to 20 tons ( per hour or part thereof ) |
2000.00 |
40.00 |
|
Forklift
capacity exceeding 20 tons ( per hour or part thereof ) |
4000.00 |
80.00 |
|
For lift or
straddle carrier of containers ( per hour or part thereof ) |
4000.00 |
80.00 |
|
Normal truck
two axis ( per hour or part thereof ) |
500.00 |
10.00 |
|
Tractor
without trailer ( per hour or part thereof ) |
300.00 |
6.00 |
|
Trailer
without tractor ( per hour or part thereof ) |
200.00 |
4.00 |
|
Grain vacuum
or liquid pumping ( per hour or part thereof ) |
500.00 |
10.00 |
|
Garbage
removal from the Vessel |
1000.00 |
20.00 |
|
Cost of
analysis in the silo laboratory ( per operation ) |
1000.00 |
20.00 |
|
Annual port
entrance permit ( per person without car ) |
750.00 |
15.00 |
|
Annual port
entrance permit
( person with car ) |
2000.00 |
40.00 |
|
Port entrance
( for one time/one person ) |
25.00 |
0.50 |
|
charge for
supplying Vessels with fuel ( per ton ) |
100.00 |
2.00 |
|
Sorting out
goods( per ton or part thereof for the whole bill of laing)
|
50% fifty per
cent of the part imposed on the Cargoes of the handling charges
as per Category of the Cargoes and for the entrance and
withdrawal option. |
|
Packing loose
Cargoes ( per ton or part thereof for the whole of the bill of
lading ) |
50% fifty per
cent of the part imposed on the Cargoes of the handling charges
as per Category of the Cargoes and for the entrance and
withdrawal option. |
|
Marine units
seated in the port basins to render services to the other marine
units(per unit /month or part thereof ) |
Syr. Pds.
5000.00 |
|
Lighters for
supplying the Vessels with water and fuel belonging to third
party(per unit/month or part thereof ) |
Syr. Pds.
2500.00 |